Large-scale infrastructure projects demand precise coordination, experienced contractors, and reliable material supply. On the DC BLOX West project in Atlanta, Georgia, those elements came together through the collaboration between The Outside Line Company (TOLC) and State Electric Supply.
TOLC completed a significant medium-voltage installation that supports the electrical backbone of the facility. State Electric Supply provided the critical materials required to keep installation crews productive and the project on schedule.
Project Overview
Project: DC BLOX West
Location: Atlanta, GA
Subcontractor: The Outside Line Company, LLC
Material Supplier: State Electric Supply
The DC BLOX West project required medium-voltage terminations across several pieces of electrical infrastructure that distribute power throughout the facility.
Installation Scope
The Outside Line Company completed medium-voltage terminations across multiple systems within the project, including:
- 5 Utility Metering Cabinets
- 2 MDC Cabinets
- 8 SDC Cabinets
- 26 Transformers
Over the course of three weeks, a 7-person TOLC crew completed 260 T-Body medium-voltage terminations across the site.
This level of installation requires both precision and efficiency. Each termination must meet strict electrical and safety standards while maintaining the project schedule.
Materials and Supply Support
To support the installation, State Electric Supply provided the key materials used throughout the project, including:
• T-Body connectors
• Elbow tap plugs
• Reducing tap plug accessories
• Grounding materials
• Installation consumables
With tight project timelines, material availability was critical. State Electric worked closely with the project team to ensure the necessary components were available when crews needed them, helping prevent delays and keep work progressing on schedule.
Quality and Execution
The completed installation successfully passed the client's QA/QC inspection with zero comments, reflecting the level of workmanship delivered by the TOLC crew.
Medium-voltage installations demand careful attention to detail, proper termination techniques, and consistent quality across every connection point. The successful inspection result underscores the professionalism and experience of the installation team.
The Value of Partnership
Projects like DC BLOX West highlight the importance of strong partnerships across the electrical supply chain. Contractors rely on responsive suppliers who understand the urgency of field schedules and can deliver specialized materials quickly.
State Electric Supply is proud to support contractors like The Outside Line Company by providing the medium-voltage products, technical support, and responsiveness needed to keep projects moving.
Supporting Medium Voltage and Utility Projects
From utility infrastructure to large commercial and data center installations, State Electric Supply supports contractors with a wide range of medium-voltage products and expertise.
Whether supplying terminations, connectors, grounding materials, or other specialized components, our team works to ensure customers have the materials they need when the job requires them.
The DC BLOX West project is one example of how collaboration between contractors and suppliers helps deliver successful results for complex electrical infrastructure projects.